We’re still waiting for the tail-lift, but I’ve been over to OEC to see it progressing. Paul is waiting for some solenoids to arrive to operate locking-pins to secure the lift in it’s various positions (to take the strain off the hydraulics when the lift is stationary). Even on it’s work-stand it looks a workContinue reading “Getting tight on the build”
Monthly Archives: December 2010
Visas
I’ve spent an ‘irritating’ day researching visa requirements (or at least updating the info I already had collated). Current thinking is that most visas can be obtained at borders. Ethiopia remains a challenge if going north due to it expiring 3 months from date of issue (unless it’s a work visa). I’ll post the ExcelContinue reading “Visas”
Finishing touches
Dropped the Azalai off at OEC today to get the finishing touches completed. Everyone is optimistic we’ll get there before Christmas, but the manufacturers of the solenoids (to operate the tail-lift locking-pins) have consistently reneged on promised delivery dates over the last few weeks. Anyway, regardless everything else can happen: Uprated headlamp bulbs (the Defender’sContinue reading “Finishing touches”
Tail-lift snag
OEC kindly dropped Paula back to us this morning sporting a few enhancements. The headlamp bulbs have been uprated, a shovel has been mounted on (Rachel’s!) wing, the seat heating has been replaced and the tail-lift hydraulics are in place. So we are all set for the rest of the winter. However the tail-lift isn’tContinue reading “Tail-lift snag”